{"id":3899,"date":"2018-09-19T23:16:06","date_gmt":"2018-09-20T04:16:06","guid":{"rendered":"https:\/\/wordpress.rose-hulman.edu\/ewb\/?p=3899"},"modified":"2022-10-11T17:00:01","modified_gmt":"2022-10-11T22:00:01","slug":"servants-at-work-wheelchair-ramp-build","status":"publish","type":"post","link":"https:\/\/wordpress.rose-hulman.edu\/ewb\/2018\/09\/19\/servants-at-work-wheelchair-ramp-build\/","title":{"rendered":"Servants at Work &#8211; Wheelchair Ramp Build"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3902 aligncenter\" src=\"http:\/\/wordpress.rose-hulman.edu\/ewb\/wp-content\/uploads\/sites\/184\/2022\/10\/09.15.2018-SAWs-Build-e1665525533181.png\" alt=\"\" width=\"586\" height=\"438\" srcset=\"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-content\/uploads\/sites\/184\/2022\/10\/09.15.2018-SAWs-Build-e1665525533181.png 586w, https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-content\/uploads\/sites\/184\/2022\/10\/09.15.2018-SAWs-Build-e1665525533181-300x224.png 300w\" sizes=\"auto, (max-width: 586px) 100vw, 586px\" \/><\/p>\n<p>EWB-RHIT participated in their first Servants at Work (SAWs) build on September 15th of the 2018-19 school year. Five students met with the SAWs coordinators at their garage to help load the prefabricated sections for the wheelchair ramp. Students and SAWs members worked for 8 hours to construct the ramp after running into some complications with an existing structure and adjusting the ramp design on the fly. Originally two metal ramps with no railings that were ineffective in the winter were the only way to get up to the house. The new ramp proved to be much sturdier and safer than the original. The owner, after a couple test runs on his wheelchair, was very pleased with the work. EWB-RHIT would like to thank SAWs for allowing us to participate in their builds and for the hands-on experience.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EWB-RHIT participated in their first Servants at Work (SAWs) build on September 15th of the 2018-19 school year. Five students met with the SAWs coordinators at their garage to help load the prefabricated sections for the wheelchair ramp. Students and SAWs members worked for 8 hours to construct the ramp after running into some complications [&hellip;]<\/p>\n","protected":false},"author":16713,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3899","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/posts\/3899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/users\/16713"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/comments?post=3899"}],"version-history":[{"count":2,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/posts\/3899\/revisions"}],"predecessor-version":[{"id":3908,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/posts\/3899\/revisions\/3908"}],"wp:attachment":[{"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/media?parent=3899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/categories?post=3899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.rose-hulman.edu\/ewb\/wp-json\/wp\/v2\/tags?post=3899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}